Installation Service
About Installation Service
Installation Service is a commonly used construction material in the Construction Services category. Our database tracks pricing data from 44 different product variations to help construction professionals make informed purchasing decisions.
Current market prices for Installation Service typically range from $8.33 to $65000.00, though actual prices may vary based on supplier, quantity, location, and market conditions.
Why Track Installation Service Prices?
- Identify cost savings opportunities by comparing quotes across vendors
- Spot pricing anomalies before they impact your project budget
- Track historical price trends for more accurate forecasting
- Benchmark your purchasing performance against current market rates
Materials
44 materialsKitchen Installation
Installation service per kitchen, 8 pieces
Provide and Install Per Plan
Provide and install per plan dated 1/20/22, with exception of Daikin VRV equipment and 4 roof fans. Scope includes: Cellar OA, CX-1, RX-1; First Floor Apt A: (1) 18000 Wall Mount, (1) 7000 Wall Mount, (2) 7000 Wall Mount - Lower Level, RXTQ48TAVJU, One Kitchen Exhaust, Two Bathroom Exhausts; Apt B: (1) 18000 Wall Mount, (2) 7000 Wall Mount, (1) 10000 Wall Mount - Lower Level, RXTQ48TAVJU, One Kitchen Exhaust, Three Bathroom Exhausts; Second Floor Apt A And B: (2) 7000 Wall Mount, (1) 18000 Wall Mount, RXTQ36TAVJU, One Kitchen Exhaust, Two Bathroom Exhausts.
(1) 18000 Ducted For Living Room/Bathroom; One Kitchen Exhaust, Two Bathroom Exhausts; Lower Level: (1) 18000 Wall Mount; One Bathroom Exhaust, One Dryer Exhaust; DAIKIN RXQT48TBVJU
(1) 18000 Ducted For Living Room/Bathroom; One Kitchen Exhaust, Two Bathroom Exhausts; Lower Level: (1) 18000 Wall Mount; One Bathroom Exhaust, One Dryer Exhaust; DAIKIN RXQT48TBVJU; 2nd-3rd Floor; Apt A,B: (2) 7000 Wall Mount; (1) 12000 Ducted For Living Room/Bathroom; One Kitchen Exhaust, Two Bathroom Exhausts, One Dryer Exhaust; DAIKIN 3MX524WMVJU9; 4th Floor; Apt A: (2) 7000 Wall Mount; (1) 18000 Ducted For Living Room/Bathroom; One Kitchen Exhaust, Two Bathroom Exhausts, One Dryer Exhaust; DAIKIN 4MXS36WMVJU9; Apt B: (2) 7000 Wall Mount; (1) 12000 Ducted For Living Room/Bathroom; One Kitchen Exhaust, Two Bathroom Exhausts, One Dryer Exhaust; Upper Level: (1) 18000 Wall Mount; One Bathroom Exhaust
220 Volt Indoor Unit Line Installation
220 Volt Line Installation for Indoor Unit
All Plates Installation
Complete installation service for all plates
Apt A HVAC Installation
Apt A - (1) 7000 Wall Mount; (1) 18000 Ducted for Living Room/Bathroom; 3MXS24WMVJU; One Kitchen Exhaust, One Bathroom Exhaust, One Dryer Exhaust.
Apt B HVAC Installation
Apt B - (1) 9000 Wall Mount; (1) 18000 Ducted for Living Room/Bathroom; 3MXS24WMVJU; One Kitchen Exhaust, One Bathroom Exhaust, One Dryer Exhaust.
Brick Wall Installation 275 square foot
Install 275 square foot of brick on the right-side wall of the lobby, including all material supply, brick cutting, and installation.
C-Hook Installation and Removal
Installation and removal notification of C-HOOK at 1073 Willoughby Ave, Brooklyn, NY 11221 according to NYC Department of Buildings regulations
Compliance Installation Service
Installation service for compliance with legal requirements. Includes warranty
Concrete Floors Installation on Metal Deck
Installation of all concrete floors on metal deck
Concrete Footing and Tie Beam Installation
Supply and install concrete footings and tie beams according to structural plan detail on page FO-101 with #6 dowels drilled with epoxy into existing foundation wall.
Crack Monitoring Installation
Installation of crack monitoring equipment
DAIKIN 5MXS48WVJU9 - Roof; One Motorized Damper At Top Of Stairs; 30x30 Stair Louver At Top Of Stairs
DAIKIN 5MXS48WVJU9 - Roof; One Motorized Damper At Top Of Stairs; 30x30 Stair Louver At Top Of Stairs; TE-1 All Duct Riser W/ Gravity Damper To Terminate At Gooseneck; TE-2 All Duct Riser W/ Gravity Damper To Terminate At Gooseneck; TE-3 All Duct Riser To Terminate At Gooseneck; TE-4 All Duct Riser To Terminate At 12x10 Louver; KE-1 All Duct Riser W/ Gravity Damper To Terminate At Gooseneck; KE-2 All Duct Riser W/ Gravity Damper To Terminate At Gooseneck; GE-1 All Duct Riser To Terminate At 12x10 Louver
Direct Line Installation for Hood/Fridge/Washer/Dryer/Laundry/GFCI/Iron
Ran a direct line for the hood, fridge, washer, dryer, laundry, GFCI, iron
Drainage System Installation
Drainage including supply and install of Cultec 360 HD Chambers, 6 inch ADS piping, 8 inch ADS piping, six catch basins, excavation, backfill, and removal
Fixture Installation
Regular Fixture Installation
Floor Installation 1st Floor Lobby
Floor Installation 1st Floor Lobby
Floor Installation Bathrooms W/ Tub (9)
Floor Installation Bathrooms W/ Tub (9)
Floor Installation Bathroom W/ Shower (3)
Floor Installation Bathroom W/ Shower (3)
Floor Installation Cellar Corridor
Floor Installation Cellar Corridor
Floor Installation Cellar Storage Room
Floor Installation Cellar Storage Room
Footings, Walls, and Beams Installation
Installation of footings, walls, grade beams, and reinforcement as per plan elevations
Heay Chandelier Installation
Installation service for heavy chandeliers
Indoor Split Unit 14/4 Line Installation
Ran a 14/4 line for the indoor split unit
Installation of Chimney and Fresh Air for Hot Water Tanks
Installation of chimney and fresh air for hot water tanks
Installation Of Indoor Cassette Units
installation of indoor cassette Units
LED Tape Light Installation
Installation of LED tape light (material not included)
Microwave Installation and Floor Covering
Installation of microwaves and covering all floors with masonite
Optical Monitoring Installation
Installation of optical monitoring equipment
Provide And Install (1) 18000 Single Wall Mount Unit For The Basement
Provide and install (1) 18000 single wall mount unit for the basement
Provide And Install Per Plan Dated 2/8/2024 With Exceptions: Changing All Units To Multi Besides For Apt 1A And 1B, Removing All Related Work To HWH Fresh Air And Chimney, Removing DXF-1,2,3, Removing ERV-1; Cellar: 8x8 Gas Vent FA-1 GE-1; 1st Floor General Area: 14x8 Intake Air Louver With Birdscreen And Motorized Damper; (1) 9000 Ceiling Cassette With Motorized Damper At Mailbox; (1) 9000 Ceiling Cassette At Lobby; DAIKIN 2MXS18WMVJU9
Provide And Install Per Plan Dated 2/8/2024 With Exceptions: Changing All Units To Multi Besides For Apt 1A And 1B, Removing All Related Work To HWH Fresh Air And Chimney, Removing DXF-1,2,3, Removing ERV-1; Cellar: 8x8 Gas Vent FA-1 GE-1; 1st Floor General Area: 14x8 Intake Air Louver With Birdscreen And Motorized Damper; (1) 9000 Ceiling Cassette With Motorized Damper At Mailbox; (1) 9000 Ceiling Cassette At Lobby; DAIKIN 2MXS18WMVJU9; 1st Floor Apt 1A: (1) 7000 Wall Mount; (1) 18000 Ducted For Living Room/Bathroom; One Kitchen Exhaust, One Bathroom Exhaust; Lower Level: (1) 18000 Wall Mount; One Bathroom Exhaust, One Dryer Exhaust; DAIKIN RX TQ48TBVJU; Apt 1B: (2) 7000 Wall Mount
Relocated Dryer Vets For 3 Apt; Added 3 Fans
Relocated dryer vets for 3 Apt; added 3 fans
Smoke Detector Installation
Smoke Detector Installation Service
Steps Installation to Backyard
Installation of steps to back yard
Stucco Installation
Install stucco received on given surface area
Supply and Install Service
Service for point of supply and installation
Switch Supply and Installation
Supplied and installed Switch
Thin Flat Brick Installation Labor
Installation of thin flat brick over 200 square foot. Labor only, materials not included. Square footage to be verified by on-site measurement and price adjusted accordingly.
Third and Fourth Floor Installation
Third and Fourth Floor Apt A and B (2) 7000 Wall Mount (1) 18000 Wall Mount RXTQ36TAVJU One Kitchen Exhaust, Two Bathroom Exhausts Roof One Motorized Damper On Top Of Stairs KX-1 ALL DUCT RISER WITH MD Fan For This Riser Is Excluded As Requested. KX-2 ALL DUCT RISER WITH MD Fan For This Riser Is Excluded As Requested. TX-1 ALL DUCT RISER WITH MD Fan For This Riser Is Excluded As Requested. TX-2 ALL DUCT RISER WITH MD Fan For This Riser Is Excluded As Requested. TX-3 ALL DUCT RISER WITH MD TX-4 ALL DUCT RISER WITH MD CX-1 ALL DUCT RISER WITH MD RX-1 ALL DUCT RISER WITH MD EF-A.
*To Be Installed 7.7' Around Tub. Remaining Walls 9'
*To Be Installed 7.7' Around Tub. Remaining Walls 9'
Trash Chute Installation
Trash Chute Installation for demolition debris removal to first floor (materials not included, based on physical inspection)
Vibration Monitoring Installation
Installation of vibration monitoring equipment
Wall and Roof Installation
Install peel stick and base on both side neighbor wall, and install rubber roof
Category: Construction Services